Renovating a bathroom is exciting, but it’s also a process that requires careful planning and patience. One of the most common questions we hear is: How long does it take to renovate a bathroom? The answer depends on several factors, from design complexity to material availability.

To help set realistic expectations, we’re breaking down the key phases of a bathroom renovation, along with what can impact the timeline. (Because no one likes surprises when it comes to construction!)

Before we dive in, hi! I’m Michelle, CEO and Principal Designer at Room Service Interiors. We specialize in transforming homes—creating spaces that are just as functional as they are beautiful. We design around your lifestyle (while taking into consideration things like resale and aging in place features you may want for the future).

As a full-service interior design studio serving Cochrane, Calgary, Bearspaw, and beyond, we manage every detail of the renovation process, from initial design concepts to the final finishing touches. Whether you’re planning a custom home renovation or reimagining a single space like a bathroom remodel, we make the process seamless, efficient, and stress-free.

WANT TO SKIP THE HEADACHES AND WORK WITH  US? CLICK HERE TO LEARN MORE ABOUT OUR “NO SURPRISES” PROCESS!

Planning Phase: Designing, Budgeting, and Selecting Materials (~6 weeks before the scheduled start date)

Every successful renovation starts with a solid plan. Before any demolition begins, we take time to design the space, establish a budget, and select all materials. If you’re wondering, ‘How long does it take to renovate a bathroom?’, this phase alone typically takes about six weeks before construction begins and includes:

  • Consultation & Design Development: We work closely with homeowners to define their style, layout needs, and must-have features. Whether it’s a spa-like retreat or a high-functioning family bath, this step ensures the design meets both aesthetic and practical goals.
  • Budgeting & Estimates: Once the design is started, we establish a realistic budget. (A clear budget upfront helps prevent delays and unexpected costs later.)
  • Material Selection & Ordering: From tiles to fixtures, everything is carefully selected during this phase. If custom elements are involved, we factor in lead times to keep the project on track.

Why does this take so much time? Because making informed decisions at this stage prevents costly changes mid-renovation. (Trust us, last-minute design changes can extend the timeline by weeks!)

modern bathroom renovation in Calgary
breakdown of how long does it take to renovate a bathroom

Demolition and Prep: The First Step in Construction (~1–2 weeks)

Once the planning is complete, the real transformation begins. Demolition usually takes about a week, depending on the size of the space and the complexity of the tear-down.

This phase includes:

  • Removing old fixtures, flooring, and walls (if necessary)
  • Checking for structural or plumbing issues that weren’t visible before
  • Prepping the space for new materials and installations

Older homes can sometimes reveal surprises—like outdated plumbing or hidden water damage—which may require additional repairs. Don’t worry though, we always plan for contingencies to keep things moving smoothly.

Construction Phase: Bringing the Design to Life (~4–6 weeks, depending on complexity)

This is where the magic happens. When considering ‘How long does it take to renovate a bathroom?, it’s important to know that this is the most time-intensive phase. During this stage, multiple trades work together to bring the design to life. The more intricate the design, the longer this phase can take.

What Happens During Construction?

  • Plumbing & Electrical Work (1–2 weeks): New plumbing lines, lighting, and ventilation are installed. Any necessary inspections happen here to ensure everything meets code.
  • Drywall & Flooring (1–2 weeks): After the walls are prepped, drywall is installed and finished. Flooring follows, whether it’s stone, tile, luxury vinyl, or another material.
  • Tiling & Custom Features (1–2 weeks or more): Tile work (especially if it’s intricate or custom) takes time. If your design includes elements like a walk-in shower with niche shelving, expect additional labor.
  • Vanity, Fixtures & Final Installations (1 week): This is when everything starts to look finished. The vanity, toilet, tub, shower doors, and hardware are all installed.

Custom home renovation projects, especially those with unique materials or detailed designs, may require extra time at this stage. (But in the end, it’s always worth the wait!)

Final Touches: Paint, Cleaning & Walkthrough (~7–10 days)

The final stage brings everything together. When thinking about how long it takes to renovate a bathroom, these last details—like paint, hardware, and a deep clean—ensure the space feels polished and complete.

This includes:

  • Painting & Touch-Ups: Walls, trim, and ceiling get a fresh coat. Any minor imperfections are corrected.
  • Deep Cleaning: Construction leaves dust and debris, so a thorough cleaning ensures the space is move-in ready.
  • Final Walkthrough & Adjustments: We go through every detail to ensure everything functions properly and looks flawless.

At this point, the bathroom is officially ready to use—a moment homeowners always look forward to!

new heritage luxury bathroom design

Factors That Can Affect Your Bathroom Renovation Timeline

Even with the best planning, some factors can extend the timeline:

  • Custom Designs & Specialty Materials: If you’re incorporating custom cabinetry, imported tiles, or specialty fixtures, longer lead times are expected.

  • Structural or Plumbing Issues: Older homes can come with hidden surprises that require extra work.

  • Supply Chain Delays: While we order materials in advance, occasional supplier delays can impact the schedule.

  • Change Orders: Making design changes mid-project can add extra time. (This is why thorough planning upfront is so important)

Planning For a Smooth Bathroom Renovation

Want to keep your project on track? Working with a professional interior designer in Bearspaw—or wherever you’re located—can make all the difference. With detailed planning from the start, we ensure that every selection is made and ordered ahead of time, preventing unnecessary delays. Efficient scheduling and coordination are key, as managing trades, deliveries, and inspections requires experience to keep everything running smoothly. And when unexpected challenges arise, expert problem-solving keeps the project moving forward without major disruptions. Renovating a bathroom is a significant investment, and partnering with professionals not only streamlines the process but also ensures a stunning, well-executed result that you’ll love for years to come.

Renovating a Bathroom Timeline

So, how long does it take to renovate a bathroom? On average, a well-planned renovation takes 6 to 10 weeks, depending on complexity and unforeseen factors. The key to a seamless process is thorough planning, expert coordination, and realistic expectations.

If you’re considering home interior remodeling or planning a custom home renovation, we’d love to help. Reach out to discuss your project, and let’s create a bathroom that’s both functional and beautiful.

If you’re considering a kitchen renovation in Cochrane, Bearspaw, Springbank, or Calgary, we’d love to chat about how we can help you bring your dream kitchen to life. Give us a call at (403) 860-5901, email us at hello@roomserviceinteriors.ca, or learn more about our team here. Let’s turn your vision into a space you’ll love—one thoughtful choice at a time!